House Construction Quality Checklist: 40 Checks from Foundation to Handover

You don’t need to be an engineer to protect the quality of your home. These are the checks we run on our own sites — use them on any site, stage by stage.
Foundation and plinth
- Soil test done and foundation designed on it
- Excavation reaches the depth in the drawing
- PCC bed laid before footing steel
- Footing and column steel matches the bar-bending schedule
- Anti-termite treatment before plinth filling
- Plinth beam level checked
Columns, beams and slabs
- Cover blocks in place under and beside the steel
- Column alignment checked with a plumb
- Formwork tight, level and propped
- Concrete mix and slump as specified; vibrator used
- Cube samples taken for each slab
- Slabs cured with water for the specified period
- Props removed only after the specified time
Block work and plastering
- Blocks soaked or wetted as specified before laying
- Walls in plumb and in line; joints filled
- Lintels over every opening
- Chicken mesh at wall–concrete joints before plaster
- Plaster thickness uniform; walls cured
Waterproofing
- Bathrooms and balconies waterproofed and pond-tested before tiling
- Terrace waterproofing with proper slope to drains
- Sump and overhead tank waterproofed
Electrical and plumbing
- Conduits and pipes laid as per drawings; photographed before plaster
- Pressure test of water lines
- Earthing done and tested
- Wire gauge and brands as per BOQ
Tiling, doors and painting
- Tiles level, joints even, no hollow sound
- Correct slope in bathrooms and balconies
- Doors and windows open and close smoothly
- Primer and putty before paint; even finish
Handover
- Snag list walked through and closed
- As-built electrical and plumbing drawings
- Warranty cards and bills
- Meters and connections transferred
Material checks for cement and steel are covered in separate guides.
Frequently asked questions
How can I check the quality of house construction?
Check the key stages yourself or with an engineer: foundation depth and steel, cover blocks and curing of slabs, plumb and line of walls, waterproofing pond tests, conduit and pipe routes before plastering, and tiling slopes.
How long should a concrete slab be cured?
Typically at least 7 days of continuous wet curing for OPC concrete and longer for blended cements, as specified by the engineer.